Purpose
Location and Area Covered
Structure of the New Town
Outline of Town Building Scheme
Research and Education District
-TRAFFIC NETWORK
-SERVICE FACILITIES
-NEW FACILITIES IN THE CITY
-City center
-The plan of the City Center
-The complete plan diagram
-PARKS and WALKWAYS
-LANDSCAPE
-HOUSING
-URBAN FACILITIES
Surrounding Suburban District
The Future of Tsukuba Science City
History

都市づくり

Research and Education District
SERVICE FACILITIES

WATER SUPPLY SYSTEM
Up to 100,000 tons of water per day for work and living at institutions and homes in the Research and Education District is provided by Ibaraki Pref. and distributed by Chikunan Water Corp. Most of the water is supplied from Lake Kasumigaura, purified at a plant in Tsuchiura, sent via 11km pipe line to a local reservoir, and distributed to the whole area.

SEWAGE SYSTEM
A parallel flow system has been adopted which handles rain water and sewage water separately. The sewage from 12 handling zones in the Research and Education District is sent via public sewage pipes and the main pipeline of regional system to a processing station in Tone-machi for discharge into the Tone River. Rain water is collected in public drainage networks, and discharged into local rivers via the city drainage conduits.



 FacilityAgencyDevelopment Status
Transportation facilitiesTrunk roadsPref., City & UD8 main roads: app. 58km
Connecting roadsPrefectureLocal principal roads
City 
Pedestrian waysCity & UDTsukuba Koen Dori, app. 5km
Azuma Dori app. 1km
Others app. 42km
Tsukuba Bus TerminalCity & UDapp. 7000m2
Parking lotsCity & UDNamiki, Takezono, and Matsushiro Zones Underground parking in Tsukuba Center Bldg.
Multi story parking
bldg.
UD & Tsukuba Urban transportation Center Inc.Gakuen West and South Multi story Parking
Water supply & sewage systemWater
supply
Prefecture & CityProjected demand 100,000 t/day
Sewage
system
Prefecture & UDPublic sewage pipes(9 pump stations),Main pipeline of the regional system(app.
23km), low terminal processing station
City
drainage conduit
City & UD3 City drainage conduits Hanamuro/Hasunuma/Ono River Basin Drainage Conduit / app. 9km
RiversPrefecture & UDRivers; Hanamuro, Hasunuma, etc
app.45km
Waste disposal facilitiesRegular garbage disposal facilityCRWAABU *Established a facility with 375 t/day capacity
Large-sized garbage disposal facilityCRWAABU *Established a facility with 50 t/day capacity
Human Waste Treatment 2nd Hygienic CenterCRWAABU *2 intakes
(N. Treat. Ctr 50kl/day, S. Treat Ctr 70kl/day
Communication facilitiesPostal Service Ministry of Internal Affairs and communications 1 general post office
(Tsukuba-Gakuen PO)
4 branch post offices (Takezono
/Namiki/
Matsushiro/
Univ. of Tsukuba POs)
Tele
communication
NTT EASTTelephone & Telegram office
City energy suppliesElectricity power supply facilitiesTokyo
Electric
Power Co.
66kV trunk transmission line, Power station,Transformer station
Gas supply facilitiesTsukuba
Gakuen
Gas Co.
Supply 11,000kcal/day of city gas
New city service facilitiesUtility tunnelPrefectureapp. 2.7km
(water, electricity & telephone)
City & UDapp. 4.7km (water, electricity, telephone, CATV, refuse conveyer pipes, zonal heating & cooling system), system control center
Refuse conveying pipe lineCity & UDCollection center, pipeline 11km, app.100 disposal chutes
Zonal heating & cooling systemTsukuba
Energy
Service, Inc.
Supply Zone (5ha for chilled water, 36ha for steam) Energy center, Total Pipe Line: 9.5km
Cable TVACCSCATV for reception fringe area, Experimental broadcasting